Mobile Sizer

10,000 TPH

Mobile Sizer

A design audit of a 10,000 TPH Mobile Sizer, designed and manufactured by MMD in the UK, was undertaken for BHP Billiton.  The sizer was installed at the Goonyella-Riverside Mine, to replace the bucket wheel excavator.  The audit covered all structural elements; including fatigue and maximum load cases, as well as issues with hydraulics and controls.  CMP Engineers also weighed the 1,760 tonne machine after fabrication.

With a group of highly experienced and qualified engineers, CMP Engineers is able to deliver innovative solutions to a wide range of mining, industrial, and environmental problems.  The team of professionals keeps abreast of the latest developments in software tools to assist in developing solutions that meet our clients’ needs.

Design-Audits-&-Specifications-02

Have any questions ?

Contact us here